ADU Rules

Bend ADU Rules (2026)

Everything homeowners need to know about building an accessory dwelling unit in Bend - size limits, setbacks, permits, and the 2025 ordinance change that let homeowners add a second ADU to help ease Central Oregon's housing crunch.

Last verified: August 2026 8/10 · Very ADU-friendly
800 sq ft*
Max ADU size
20 ft
Max height
Not required
Owner-occupancy
By-right
Permit type
This page summarizes Bend's accessory dwelling unit standards under Bend Development Code Section 3.8.300 (Small Dwelling Unit Development) for general reference - it is not legal advice. Regulations change; always confirm current requirements with the City of Bend Planning Division before designing or applying for permits. See sources below.
Zoning & size requirements

What you're allowed to build

ADU typeMax sizeMax heightNotes
First ADU (detached, attached, or a combination) 800 sq ft 20 ft Raised from 18 ft under a June 2025 ordinance
Second ADU (in addition to the first) 500 sq ft 20 ft Allowed citywide since June 2025; sized smaller to encourage single-room units
Allowed zoning districts

ADUs are allowed with a single-family home across Bend's residential zoning districts. Bend also now allows a second kitchen inside the primary home for multigenerational households. Confirm your zoning district and exact site standards with the Planning Division before designing.

Additional standards

Setbacks, parking & other rules

SetbacksA detached ADU generally needs at least 6 ft of separation from the main house, plus the standard residential setback for your zoning district; exact figures depend on your zone and lot, so confirm them at pre-application review
ParkingNo additional off-street parking required. Oregon state law bars cities from requiring it, and Bend dropped its own ADU parking requirement in 2019
Units per lotUp to 2 ADUs per lot as of June 2025 (previously capped at 1)
Owner-occupancyNot required. Oregon's HB 2001 bars cities from conditioning ADUs on owner-occupancy
Building codeMust meet Oregon Residential Specialty Code dwelling-unit standards
Rental licenseNo separate long-term rental license currently required; confirm current short-term rental registration rules with the city if that's your plan
Ordinance history

How Bend's ADU rules got here

By 2025, Bend had issued roughly 954 ADU permits since 2001, more than 750 of them in just the prior decade, according to reporting in The Bulletin. Even so, state housing regulators have told Bend it needs more than 15,000 new housing units within eight years, at least half of them affordable - a target that's hard to hit given a tight urban growth boundary the city has expanded nine times since 1981. City housing staff have pointed to ADUs as one of the few housing types that still fit on already-developed lots. Oregon's Department of Land Conservation and Development reviews city ADU codes for compliance with state law; Bend's code hasn't been flagged for falling short.

Permit process

How Bend ADU permitting works

1

Pre-application check

Confirm your zoning district, lot constraints, and whether you're pursuing one or two ADUs with Bend's Planning Division before you design.

2

Pick a design

Consider the city's pre-approved ADU design library, launched with the Bend Chamber in September 2025, which can skip much of the design-review time versus a fully custom plan.

3

Prepare your plan set

Site plan, floor plans, elevations, and a calculation showing how the ADU (or two ADUs) fits within your zoning district's standards.

4

Submit for zoning & building permit review

File with the Community Development Department; reviewers check zoning compliance, setbacks, and Oregon Residential Specialty Code standards.

5

Pay applicable fees

Budget for building permit fees plus System Development Charges for water, sewer, transportation, and parks, unless your project qualifies for an income-restricted affordable-housing deferral.

6

Construction & inspections

Once permits issue, schedule the standard framing, plumbing, electrical, and final inspections before occupancy.

Fees and review timelines vary by project scope and current workload - confirm current figures with the City of Bend's Planning Division and Building Safety division before budgeting.

Budgeting

What it costs to build an ADU in Bend

Garage conversionRoughly $90,000-$180,000, running higher than Willamette Valley cities given Central Oregon's tighter construction labor market
Basement conversionLess common in Bend's high-desert building stock than in wetter parts of the state, but roughly $120,000-$220,000 where feasible
New detached ADURoughly $180,000-$340,000+; local builders and real-estate sources describe Bend pricing as at or above Portland-area levels given resort-market demand
System Development Charges (SDCs)Commonly cited in the $8,000-$20,000 range for water, sewer, transportation, and parks combined; Bend's tiered fee structure charges smaller units less, and income-restricted affordable ADUs may qualify for a deferral
Building permit feesTypically a few thousand dollars, separate from SDCs

These are general ranges from local contractor estimates and regional reporting, not quotes - actual cost depends heavily on lot conditions, finishes, and utility access. Bend's cost premium over cities like Eugene and Salem is a recurring theme in local reporting, driven by high housing demand, land constrained by the urban growth boundary, and construction costs comparable to or above the Portland metro area.

Before you apply

Tips for a smooth approval

FAQ

Common questions

Do I need to live on the property to build an ADU in Bend?
No. Oregon's HB 2001 bars cities statewide from requiring owner-occupancy for ADUs, and Bend's code reflects that.
How many ADUs can I build on one lot in Bend?
Since a June 2025 ordinance, up to two: a first ADU up to 800 sq ft and a second, smaller ADU up to 500 sq ft. Before that change, Bend allowed only one.
Do I need extra parking for an ADU?
No. Oregon state law bars cities from requiring off-street parking for ADUs, and Bend dropped its own parking requirement in 2019.
What's the maximum size for an ADU in Bend?
800 sq ft for a first ADU. If you add a second ADU on the same lot, it's capped at 500 sq ft.
How tall can a Bend ADU be?
Up to 20 ft, raised from an 18 ft limit under the June 2025 ordinance.
How long does the permit process take?
Timelines depend on application completeness, project scope, and current workload - confirm current estimates with the City of Bend Planning Division before you plan a construction schedule.
How much does an ADU cost to build in Bend?
Garage conversions run roughly $90,000-$180,000, basement conversions roughly $120,000-$220,000, and new detached units roughly $180,000-$340,000+, based on local contractor estimates and regional reporting - not counting System Development Charges.
What are Bend's System Development Charges for an ADU?
Commonly cited in the $8,000-$20,000 range for water, sewer, transportation, and parks combined, with smaller units charged less under the city's tiered fee structure. Income-restricted affordable ADUs may qualify for a deferral.
Does Bend offer pre-approved ADU plans?
Yes. A library of pre-approved designs launched in September 2025, developed with the Bend Chamber of Commerce and funding from Simplicity by Hayden Homes, using the city's Master Re-Issue Permit system to speed up review.
Nearby options

ADU rules in nearby cities

Ready to build in Bend?

Get matched with vetted local ADU builders - free for homeowners, with no obligation.

Sources

Where this information comes from