ADU Rules

Denver ADU Rules (2026)

Everything homeowners need to know about building an accessory dwelling unit in Denver - size limits, setbacks, permits, and how the city's own ADU program now lines up with Colorado's new statewide ADU law.

Last verified: August 2026 9/10 · Very ADU-friendly
1,000 sq ft*
Max ADU size
24 ft
Max height
Not required
Owner-occupancy
By-right
Permit type
This page summarizes the Denver Zoning Code's ADU standards, as updated by the city's December 2024 citywide text amendment and Colorado's statewide ADU law (HB 24-1152), for general reference - it is not legal advice. Regulations change; always confirm current requirements with Denver Community Planning & Development (CPD) before designing or applying for permits. See sources below.
Zoning & size requirements

What you're allowed to build

ADU typeMax sizeMax heightNotes
Detached (new build or garage conversion) Up to 1,000 sq ft on larger lots; smaller lots are capped lower (roughly 650 sq ft under 6,000 sq ft, and roughly 864 sq ft on 6,000-7,000 sq ft lots) 24 ft; generally 1.5 stories, with 2-story ADUs allowed in more urban zone districts Must be sited within the rear 35% of the lot, with at least a 5 ft rear setback
Attached / internal (basement, above-garage addition) Sized within the primary structure - no separate detached-style footprint cap Same as primary structure Common approach for a basement or above-garage conversion
Allowed zoning districts

Following a citywide text amendment (CB24-1303) effective December 16, 2024, ADUs are allowed by right in every zone district that allows a single-unit dwelling - covering roughly 70% of Denver's residential land area, up from about 36% before the update - with no rezoning needed in eligible zones. Confirm your parcel's zoning with Denver Community Planning & Development (CPD).

Additional standards

Setbacks, parking & other rules

SetbacksDetached ADUs must sit within the rear 35% of the lot with at least a 5 ft rear setback; side and front setbacks generally follow the underlying zone district's standard house setbacks
ParkingNo dedicated off-street parking is required for the ADU itself; Colorado's HB 24-1152 also bars most parking mandates statewide
Units per lot1 ADU permitted per single-unit lot, in addition to the primary dwelling
Owner-occupancyNot required. Denver's citywide text amendment (effective December 2024) and Colorado's HB 24-1152 (fully effective June 30, 2025) both remove owner-occupancy as a condition of building or renting an ADU. This is a recent change - confirm current status with CPD, especially if you're relying on an older source
Building codeMust meet Denver Building and Fire Code dwelling-unit standards
Rental licenseA city rental license is required for most long-term residential rentals, including ADUs; short-term rental licensing has separate rules and may still require owner-occupancy of the primary residence
Ordinance history

How Denver's ADU rules got here

Denver had already built much of its own ADU program before the state law arrived, so HB 24-1152 mostly reinforced changes the city had made on its own - unlike many smaller Colorado cities and suburbs, where the state law forced ADUs to be allowed for the first time.

Permit process

How Denver ADU permitting works

1

Confirm zoning eligibility

Check whether your property is in a zone district that allows single-unit dwellings using Denver's zoning map; if so, an ADU is allowed by right and rezoning isn't required.

2

Hire a licensed contractor

Denver requires ADU permit applications to be filed by a licensed contractor rather than the homeowner directly, with limited exceptions.

3

Prepare your plan set

Site plan, building elevations, structural plans, and manufacturer cut sheets as needed, plus documentation confirming the status of the primary structure.

4

Apply through Denver's e-permits portal

Submit for zoning, building, and Sewer Use and Drainage Permit (SUDP) review together as a "Single Family/Duplex Residential" project.

5

Plan review & permit issuance

CPD reviews for zoning and building code compliance; trade permits (electrical, plumbing, mechanical) are issued once the residential construction permit is active.

6

Inspections & certificate of occupancy

Schedule required inspections through construction and obtain your Certificate of Occupancy before anyone moves in; the ADU also needs its own address.

Fees and review times vary by project value and CPD's current workload - confirm current numbers with Denver Community Planning & Development before budgeting.

Budgeting

What it costs to build an ADU in Denver

Garage conversionRoughly $75,000-$160,000, the least expensive path since the shell already exists
Basement conversionRoughly $110,000-$210,000, depending on existing ceiling height and utility access
New detached ADURoughly $160,000-$300,000+ for a code-compliant, fully insulated freestanding unit
Building permit & SUDP feesCommonly in the $5,000-$8,000 range combined for a typical ADU project, including the Sewer Use and Drainage Permit
Water & sewer tap feesA Denver Water system development charge plus a separate sewer tap fee, together commonly landing in the high thousands to low tens of thousands of dollars depending on your water district

These are general ranges from local contractor estimates and regional reporting, not quotes - actual cost depends heavily on lot conditions, utility access, and finishes. Denver ADUs are exempt from the city's Affordable Housing Linkage Fee, which helps offset some of the tap and permit costs above.

Before you apply

Tips for a smooth approval

FAQ

Common questions

Do I need to live on the property to build an ADU in Denver?
No, not anymore. Denver removed its owner-occupancy requirement citywide effective December 16, 2024, and Colorado's HB 24-1152 reinforced that statewide as of June 30, 2025. Confirm current status with CPD, since this is a recent change.
How many ADUs can I build on one lot in Denver?
One ADU is allowed per single-unit lot, in addition to the primary dwelling.
Do I need extra parking for an ADU?
No dedicated off-street parking is required for the ADU itself, and Colorado's statewide ADU law also bars most parking mandates.
What's the maximum size for a detached ADU in Denver?
Up to 1,000 sq ft on larger lots, though smaller lots are capped lower (roughly 650-864 sq ft depending on lot size), with a 24 ft height limit.
How long does the permit process take?
Timelines vary with project value and CPD's current workload; confirm current review times with Community Planning & Development before budgeting your schedule.
How much does an ADU cost to build in Denver?
Garage conversions run roughly $75,000-$160,000, basement conversions roughly $110,000-$210,000, and new detached units roughly $160,000-$300,000+, based on local contractor estimates and regional reporting - not counting permit and utility tap fees.
Does Denver's ADU program predate Colorado's statewide law?
Yes. Denver had its own ADU zoning program and a 2023 expansion before Colorado passed HB 24-1152 in 2024; the state law, fully effective June 30, 2025, mainly reinforced and extended changes Denver had already made locally.
Do I need to be a licensed contractor to apply for an ADU permit?
You don't need to be a contractor yourself, but Denver requires the permit application to be filed by a licensed contractor rather than the homeowner directly, with limited exceptions.
Can I rent my ADU out on Airbnb or a short-term rental platform?
Denver regulates short-term rentals separately from long-term rental licensing, and short-term rental rules may still require owner-occupancy of the primary residence even though long-term ADU rentals no longer do. Confirm current short-term rental requirements before finalizing your plans.
Nearby options

ADU rules in nearby cities

Ready to build in Denver?

Get matched with vetted local ADU builders - free for homeowners, with no obligation.

Sources

Where this information comes from