ADU Rules

Sacramento ADU Rules (2026)

Everything homeowners need to know about building an accessory dwelling unit in Sacramento - size limits, setbacks, permits, and how the city's free preapproved plans can make the process faster and cheaper than almost anywhere else in California.

Last verified: August 2026 9/10 · Very ADU-friendly
1,200 sq ft
Max ADU size
16 ft*
Max height
Not required
Owner-occupancy
By-right
Permit type
This page summarizes Sacramento City Code Section 17.228.105 (Accessory Dwelling Units and Junior Accessory Dwelling Units), layered on top of California's statewide ADU law (Gov. Code Sec 65852.2), for general reference - it is not legal advice. Regulations change; always confirm current requirements with the City of Sacramento's Community Development Department before designing or applying for permits. See sources below.
Zoning & size requirements

What you're allowed to build

ADU typeMax sizeMax heightNotes
Detached (new construction) Up to 1,200 sq ft total, split across up to 2 detached ADUs on one lot (e.g., a 400 sq ft unit plus an 800 sq ft unit) 16 ft general standard; up to 18 ft (plus up to 2 ft for roof pitch) for ADUs built under the state's ministerial pathway Sacramento allows 2 ADUs (attached and/or detached) per qualifying lot
Attached (addition to primary home) 50% of the primary dwelling's floor area or 850 sq ft, whichever is greater (1,000 sq ft for 2+ bedroom units) Same as primary structure  
Converted (garage, interior) Sized to the existing structure's footprint Same as existing structure Generally exempt from standard new-construction setback rules
Junior ADU Built within the primary home's existing walls Same as primary structure Requires the owner to occupy the JADU or the primary residence
Allowed zoning districts

Allowed citywide on any lot with an existing or proposed primary residential structure. Sacramento also offers a library of free, preapproved "shelf-ready" ADU plans through its Planning Division that have already cleared plan check - confirm your parcel's zoning and eligibility at adu.cityofsacramento.org.

Additional standards

Setbacks, parking & other rules

SetbacksMinimum 4 ft side and rear setbacks for most new-construction ADUs; front setback follows the underlying zoning district. Conversions of existing legal structures are generally exempt from setback rules
ParkingNo additional off-street parking required for an ADU or JADU, including when an existing garage is converted
Units per lotUp to 2 ADUs (attached and/or detached) plus 1 JADU on a qualifying lot with an existing or proposed primary residence
Owner-occupancyNot required for a standard ADU; a JADU requires the owner to occupy either the JADU or the primary residence
Building codeMust meet current California Building, Residential, Energy, Plumbing, Mechanical, and Electrical Code standards
Fire sprinklersMost detached ADUs under 1,200 sq ft are exempt from fire sprinkler requirements if the main home isn't sprinklered
Impact feesWaived for ADUs under 750 sq ft (state SB 13); applied on a prorated basis above that, plus separate school-district impact fees
Ordinance history

How Sacramento's ADU rules got here

Sacramento's biggest practical advantage over many California cities is process speed: pairing a preapproved plan with the city's concurrent plan-review option can move a detached ADU into construction well faster than a fully custom design, since the structural and energy-code review is already done. Statewide, cities now issue more than 20,000 ADU permits a year, roughly a quarter of all housing approvals since the 2017 law took effect.

Permit process

How Sacramento ADU permitting works

1

Pre-application check

Confirm zoning eligibility and check whether a preapproved shelf-ready plan fits your lot at adu.cityofsacramento.org.

2

Prepare your plan set (or pick a preapproved plan)

Custom projects need a full plan set; preapproved plans only require a site-specific site plan.

3

Planning approval or concurrent review

Request concurrent review via a Memorandum of Understanding to run planning and building review in parallel, saving time.

4

Building permit submittal

Submit to the Building Division electronically or at the public counter; a minimum of two full plan sets is required.

5

Plan check & permit issuance

Standard review for code compliance; the city targets a 60-day cycle for complete ADU applications.

6

Construction & inspections

Schedule the standard framing, plumbing, electrical, and final inspections as work proceeds.

Fees and timelines are approximate and change periodically - confirm current figures with the Community Development Department's Help Line before you budget or apply.

Budgeting

What it costs to build an ADU in Sacramento

Garage conversionRoughly $70,000-$170,000, the least expensive path since the shell already exists
Basement conversionRoughly $100,000-$210,000, depending on existing ceiling height and utility access
New detached ADURoughly $150,000-$320,000+; a preapproved plan can trim design costs and shorten the timeline versus a fully custom design
Impact feesWaived for ADUs under 750 sq ft; applied on a prorated basis above that, plus separate school-district impact fees that vary by district
Permit fee estimate service$164 flat fee for a formal building permit fee estimate from the city

These are general ranges from local contractor estimates and regional reporting, not quotes - actual cost depends heavily on lot conditions, finishes, and whether you use a preapproved plan versus a custom design. Sacramento's construction costs tend to run below the Bay Area, though still above the national median.

Before you apply

Tips for a smooth approval

FAQ

Common questions

Do I need to live on the property to build an ADU in Sacramento?
No, not for a standard ADU. Only junior ADUs carry an owner-occupancy requirement, and even then, exceptions apply for public agencies, land trusts, and housing organizations.
How many ADUs can I build on one lot?
Up to 2 ADUs (attached and/or detached, totaling 1,200 sq ft for detached units) plus 1 junior ADU, as long as there's an existing or proposed primary residence on the lot.
Do I need extra parking for an ADU?
No. Sacramento doesn't require additional parking for an ADU or JADU, even when converting an existing garage.
How long does the permit process take?
Sacramento targets a 60-day review cycle for complete applications. Preapproved plans move faster since the design has already cleared plan check, with some homeowners reporting approval in as little as 30 days.
What's the maximum size for a detached ADU?
Up to 1,200 sq ft total across up to two detached units, with a 16 ft height limit generally (up to 18 ft, plus up to 2 ft for roof pitch, for ADUs built under the state's ministerial pathway).
How much does an ADU cost to build in Sacramento?
Garage conversions tend to run roughly $70,000-$170,000, basement conversions $100,000-$210,000, and new detached units $150,000-$320,000 or more, based on local contractor estimates and regional reporting.
What are the preapproved "shelf-ready" ADU plans?
A library of free ADU floor plans, offered under the state's AB 1332 preapproved ADU program, that have already cleared structural and energy-code plan check. Choosing one instead of a custom design typically means a faster, cheaper path through permitting.
Do I need a special permit to rent my ADU short-term on Airbnb?
Yes. Sacramento requires a Short-Term Rental Permit (around $200/year) for any rental under 30 days, in addition to standard ADU permitting - confirm current rules with the city before you finalize your plans.
Are impact fees really waived for small ADUs?
Yes. Under statewide SB 13, ADUs under 750 sq ft are exempt from development impact fees. Larger units pay a prorated share, and separate school-district impact fees may still apply regardless of size.
Nearby options

ADU rules in nearby cities

Ready to build in Sacramento?

Get matched with vetted local ADU builders - free for homeowners, with no obligation.

Sources

Where this information comes from