Roseville ADU Rules (2026)

Everything homeowners need to know about building an accessory dwelling unit in Roseville - size limits, setbacks, permits, and where the city's own ordinance still has some catching up to do with state law.

Last verified: August 2026 6/10 · ADU-friendly
1,000 sq ft
Max ADU size
16 ft*
Max height
Not required
Owner-occupancy
By-right
Permit type
This page summarizes Roseville Municipal Code Chapter 19.60 (Accessory Dwelling Units) and California's statewide ADU law for general reference - it is not legal advice. Regulations change; always confirm current requirements with the City of Roseville Development Services Department before designing or applying for permits. See sources below.
Zoning & size requirements

What you're allowed to build

ADU typeMax sizeMax heightNotes
Detached, studio or 1-bedroom 850 sq ft 16 ft typically; two-story detached units allowed in some zones Minimum size 150 sq ft
Detached, 2+ bedrooms 1,000 sq ft 16 ft typically; two-story detached units allowed in some zones 4 ft rear and interior side setback for new construction
Junior ADU (JADU) 500 sq ft Same as primary structure Must be built within the walls of the existing house
Allowed zoning districts

Permitted with an existing primary residence in CMU, R1, RS, R2, R3, and RMU residential zones, and in NC, CC, GC, HC, and CBD commercial zones where an existing residence has an approved conditional use permit. Confirm your parcel's zoning with Development Services.

Additional standards

Setbacks, parking & other rules

Setbacks4 ft from rear and interior side property lines for new construction; conversions of legally established structures are generally exempt from added setbacks
Parking1 off-street space per unit or per bedroom, whichever is less, for units with a bedroom; studios need none; waived within a half-mile walk of transit
Units per lot1 ADU plus 1 JADU on a qualifying single-family lot, consistent with the statewide framework
Owner-occupancyNot required for a standard ADU since a 2020 ordinance update, reinforced by California's 2024 AB 976. A JADU generally requires owner-occupancy unless it has its own bathroom, per 2026's AB 1154
Rental termsADUs must be rented for more than 30 calendar days; the city does not issue short-term rental permits for ADUs
Building codeNewly constructed ADUs must comply with all applicable local building and fire codes, including the current California Residential Code
Ordinance history

How Roseville's ADU rules got here

Worth knowing: Roseville was an early mover on removing owner-occupancy rules back in 2020, but its most recent ordinance update ran into a real compliance problem with the state. As of the most recent public reporting, the fix was still moving through the City Council - ask Development Services directly whether the amended ordinance has been adopted before you finalize a design that depends on the disputed provision.

Permit process

How Roseville ADU permitting works

1

Pre-application check

Confirm your zoning district and any lot-specific constraints with Development Services, (916) 774-5332 or buildingdivision@roseville.ca.gov, before designing.

2

Consider a preapproved plan

Roseville maintains a preapproved ADU plan program under state law (AB 1332), which can shorten design and review time versus a fully custom project.

3

Prepare your plan set

You'll need a site plan, floor plans and elevations for the ADU, and supporting documentation to confirm the size and setback calculations.

4

Submit your building permit application

Applications are reviewed administratively, with no public hearing required. Plan check has typically run around 6-8 weeks; state law sets a 60-day outer limit, with deemed-approval provisions under SB 543 if the city misses it.

5

Plan review & permit issuance

The city checks your submittal for zoning and building code compliance before issuing the building permit.

6

Construction & inspections

Once permitted, schedule the standard framing, plumbing, electrical, and final inspections through Development Services.

Fees and timelines are approximate and subject to change, including a 1.31% construction cost index fee adjustment effective July 1, 2026 - confirm current figures with Development Services.

Budgeting

What it costs to build an ADU in Roseville

Garage conversionRoughly $70,000-$185,000, the least expensive path since the shell already exists
Basement/addition conversionRoughly $100,000-$225,000, depending on existing structure and utility access
New detached ADURoughly $155,000-$300,000+ for a code-compliant, freestanding unit
Permit feesRoughly $3,500-$12,000 depending on project scope and valuation

These are general ranges from local contractor estimates and regional reporting, not quotes - actual cost depends heavily on lot conditions, finishes, and whether utilities need to be extended.

Before you apply

Tips for a smooth approval

FAQ

Common questions

Do I need to live on the property to build an ADU in Roseville?
No. Roseville dropped its owner-occupancy requirement for standard ADUs back in 2020, and California's AB 976 made that permanent statewide in 2024. A JADU generally still requires owner-occupancy unless it has its own bathroom, under 2026's AB 1154.
What's the maximum size for a detached ADU in Roseville?
850 sq ft for a studio or 1-bedroom unit, or 1,000 sq ft for a unit with 2 or more bedrooms, with a 150 sq ft minimum.
Do I need parking for an ADU?
Usually yes - one space per unit or per bedroom, whichever is less - unless it's a studio, or the ADU sits within a half-mile walk of a transit stop.
How long does the permit process take?
Plan check has typically run around 6-8 weeks, and state law caps ministerial review at 60 days, with deemed-approval provisions if the city misses that window. Confirm current timelines with Development Services.
Is it true HCD found problems with Roseville's ADU ordinance?
Yes. In a January 6, 2026 findings letter, the California Department of Housing and Community Development concluded that Roseville's 2024 ADU ordinance (No. 6829) improperly allowed the city to require fire sprinklers in the existing primary home when an ADU is added, which conflicts with state law. The city was required to respond by February 5, 2026, and amendments have been moving through the Planning Commission and City Council since. Confirm the ordinance's current status with Development Services before relying on it.
How much does an ADU cost to build in Roseville?
Garage conversions tend to run roughly $70,000-$185,000, basement or addition conversions $100,000-$225,000, and new detached units $155,000-$300,000 or more, based on local contractor estimates and regional reporting - not counting permit fees.
Can I rent my ADU out on Airbnb or a short-term rental platform?
No. Roseville requires ADU rentals to run more than 30 calendar days and does not issue short-term rental permits for accessory dwelling units.
Are preapproved ADU plans available in Roseville?
Yes. The city maintains a preapproved ADU plan program required by state law (AB 1332), which can reduce design cost and review time compared to a fully custom plan.
Does Roseville require a public hearing to approve my ADU?
No. Qualifying ADU applications are reviewed administratively by staff, without a public hearing, consistent with California's ministerial, by-right approval requirement.
Nearby options

ADU rules in nearby cities

Ready to build in Roseville?

Get matched with vetted local ADU builders - free for homeowners, with no obligation.

Sources

Where this information comes from