ADU Rules

Washington, D.C. ADU Rules (2026)

Everything homeowners need to know about building an accessory apartment in the District of Columbia - size limits, the alley-access rules that shape backyard cottages, and the owner-occupancy requirement that still applies here even though many other cities have dropped it.

Last verified: August 2026 6/10 · Moderately ADU-friendly
450 sq ft*
Max ADU size
22 ft
Max height
Required*
Owner-occupancy
By-right
Permit type
This page summarizes Title 11 DCMR (District of Columbia Municipal Regulations), Subtitle U § 253 and Subtitle D, Chapter 50 (accessory apartment and accessory building standards) for general reference - it is not legal advice. Washington, D.C. is not part of any state and has no county government; the DC Zoning Commission and DC Council are the top-level authorities, with no separate state law layered underneath. Regulations change; always confirm current requirements with the DC Department of Buildings (DOB) before designing or applying for permits. See sources below.
Zoning & size requirements

What you're allowed to build

ADU typeMax sizeMax heightNotes
Accessory apartment within the principal dwelling (basement, above-garage, or attached addition) Up to 35% of the principal dwelling's gross floor area (GFA) Same as the principal dwelling The house itself must have at least 2,000 sq ft of GFA in the R-1-A, R-1-B and R-19 zones, or 1,200 sq ft in most other R zones, to qualify
Accessory apartment in a detached accessory building (backyard cottage, garage apartment, carriage house) Greater of 450 sq ft or 30% of the required rear yard area (450 sq ft is the larger, controlling figure on most lots) 2 stories and 22 ft Must be reached by an 8 ft-wide path to the street, a 24 ft-wide alley, or a 15+ ft-wide alley within 300 ft of a public street
Allowed zoning districts

DC's zoning code calls this use an "Accessory Apartment" (Title 11 DCMR, Subtitle U § 253) - "ADU" and "accessory dwelling unit" are used interchangeably in practice and on this page. Accessory apartments are allowed as a matter-of-right (no discretionary approval needed) in nearly every Residential (R) zone citywide, including R-1-A, R-1-B, R-2, R-3, and R-6 through R-21. The two Georgetown zones, R-19 and R-20, are the exception: an accessory apartment there requires a special exception from the Board of Zoning Adjustment. Confirm your parcel's zone on DC's official zoning map before designing.

Additional standards

Setbacks, parking & other rules

SetbacksDetached accessory buildings must sit at least 7.5 ft from the centerline of a rear alley; no side yard is required for the accessory building itself
ParkingNo additional off-street parking is required for the accessory apartment itself. The one parking space required for the principal dwelling can't be eliminated to make room for the ADU without being replaced
Units per lot1 accessory apartment permitted per lot, in addition to the principal dwelling, in R zones
Owner-occupancyRequired, but flexible: either the principal dwelling or the accessory apartment must be owner-occupied for the duration of the accessory apartment use. You don't have to live in the main house specifically, but the property can't be entirely non-owner-occupied while the ADU is in use
Occupancy limitNo more than 3 people may live in the accessory apartment (up to 6 combined with the principal dwelling in the R-19 and R-20 zones)
Building codeMust meet DC's amended versions of the International Residential Code or International Building Code, including DC-specific ceiling-height and egress requirements
Certificate of OccupancyNot required for an accessory apartment in an R zone, since it's treated as a secondary use of a one-family property. A second dwelling added in an RF or RA zone is a different category and does require one
Rental licenseA One-Family Residential Rental Business License (Basic Business License) from DLCP is required to rent out the ADU or the primary home, plus registration with DHCD's Rental Accommodations Division
Roof decksNot permitted on accessory buildings
Ordinance history

How D.C.'s ADU rules got here

Worth knowing: even with matter-of-right zoning in place since 2016, ADU production in DC has stayed modest - the DC Office of Planning has reported fewer than 50 accessory apartments approved per year citywide, and reporting on the city's own RAAP subsidy pilot found only a handful of its target units actually completed as of mid-2025. Financing, DC's high construction costs, and a permitting process built for larger projects are the barriers most often cited by advocates and city planners.

Permit process

How D.C. ADU permitting works

1

Confirm your zoning and eligibility

Look up your property's zone on DC's official zoning map and confirm your lot qualifies for an accessory apartment. Most R zones do by-right; R-19 and R-20 require a special exception. A pre-application check with DOB's Zoning Administrator can catch problems early.

2

Hire an architect and prepare a full drawing set

DC requires a complete architectural, structural, plumbing, mechanical, electrical, and fire-protection drawing set for any new dwelling unit - a registered architect or engineer is required regardless of who manages the rest of the project.

3

Assemble supporting documents

Gather your plat from the DC Office of the Surveyor, a DC Water service worksheet, an Energy Verification Sheet for the Department of Energy and Environment, and a structural certification if significant structural work is involved.

4

Submit your application to DOB

File online through DC's permitting portal, pay the initial invoice, and upload your drawing set for review. Properties in a historic district also need a separate Historic Preservation Office review, which can run alongside or before the DOB application.

5

Respond to plan review comments

Reviewers from each discipline - zoning, structural, plumbing, and more - return comments; expect at least one review cycle before your permit is approved. More complex projects or those needing zoning relief take longer.

6

Build, inspect, and license the rental

Once your permit issues, pull trade permits and schedule inspections as work proceeds. An accessory apartment in an R zone doesn't need a separate Certificate of Occupancy, but you'll need a One-Family Rental Business License from DLCP before renting it out.

Plan review has historically taken anywhere from several weeks to a few months depending on application completeness, and considerably longer if historic review or a special exception is involved. Fees and timelines change as DOB updates its systems and fee schedule - confirm current figures directly with DOB before budgeting.

Budgeting

What it costs to build an ADU in D.C.

Accessory apartment in an existing garage or accessory buildingRoughly $130,000-$230,000; converting an existing structure keeps costs down, though DC's compact 450 sq ft cap keeps per-square-foot costs high
Basement/cellar apartmentRoughly $150,000-$260,000, more if underpinning is needed to meet DC's ceiling-height and egress requirements in a rowhouse basement
New detached accessory buildingRoughly $150,000-$300,000+ for a fully code-compliant unit at DC's small permitted footprint
Permit and plan-review feesCommonly estimated in the $1,000-$3,000 range depending on construction valuation - confirm DOB's current fee schedule when you apply
Architect feesTypically 10-20% of construction cost for the full professional drawing set DC requires

These are general ranges drawn from local contractor estimates and reporting on completed DC projects, not quotes - actual cost depends heavily on lot access, whether underpinning or utility relocation is needed, and finish level. DC's small accessory-building footprint (450 sq ft in most cases) means detached units often cost more per square foot than larger ADUs allowed elsewhere, since a kitchen and bathroom cost roughly the same no matter how small the unit around them is.

Before you apply

Tips for a smooth approval

FAQ

Common questions

Do I need to live on the property to build an accessory apartment in D.C.?
Not exactly, but one of the two units has to be owner-occupied. DC's rule lets the owner live in either the principal dwelling or the accessory apartment - you don't specifically have to live in the main house, but the property can't be fully non-owner-occupied while the accessory apartment use is active.
What does D.C.'s zoning code call an ADU?
"Accessory Apartment" is the defined term in Title 11 DCMR, Subtitle U § 253. "Accessory dwelling unit" and "ADU" are used interchangeably in practice and in DC's own planning materials, but "accessory apartment" is the term that actually appears in the zoning code.
How big can a detached ADU be in D.C.?
In most R zones, a detached accessory building is capped at the greater of 450 sq ft or 30% of the required rear yard area - in practice, 450 sq ft is usually the larger, controlling figure. It can be up to 2 stories and 22 ft tall.
How big can an attached or basement ADU be?
Up to 35% of the principal dwelling's gross floor area, and only if the house itself has at least 2,000 sq ft of GFA (R-1-A, R-1-B, R-19 zones) or 1,200 sq ft (most other R zones).
Do I need extra parking for an ADU?
No additional off-street parking is required specifically for the accessory apartment. The one parking space required for the principal dwelling can't be removed to make room for it without being replaced.
Is D.C. part of a state ADU law, the way California or Washington-state cities are?
No. DC is not part of any state and has no county government either - Title 11 DCMR, adopted by the DC Zoning Commission, is the top-level zoning authority with no separate state law layered underneath it. Congress retains limited oversight of DC legislation under the Home Rule Act, but this essentially never affects day-to-day zoning or building-permit administration.
Which agency handles ADU permits in D.C.?
The Department of Buildings (DOB), created in October 2022 when the former Department of Consumer and Regulatory Affairs (DCRA) was split into two agencies: DOB, which handles permitting, inspections, and zoning administration, and the Department of Licensing and Consumer Protection (DLCP), which handles business and rental licenses.
How much does an ADU cost to build in D.C.?
Converting an existing garage or accessory building tends to run roughly $130,000-$230,000, a basement conversion roughly $150,000-$260,000, and a new detached unit roughly $150,000-$300,000 or more, based on local contractor estimates and reporting on completed DC projects. DC's small permitted footprint and high construction costs keep per-square-foot pricing high even for compact units.
Is D.C. actually building many ADUs?
Not many yet. Even with matter-of-right zoning since 2016, DC's Office of Planning has reported fewer than 50 accessory apartments approved per year citywide, and the city's own RAAP subsidy pilot fell well short of its unit targets through 2025. Financing, construction cost, and a permitting process built for larger projects are the barriers most commonly cited.
Other options

ADU rules in other cities

Ready to build in Washington, D.C.?

Get matched with vetted local ADU builders - free for homeowners, with no obligation.

Sources

Where this information comes from